Environmental Impact Assessment Report
Volume I Non-Technical Summary
Volume II Main EIAR
Chapter 2 - Need for the Development and Alternatives Considered
Chapter 3 – Description of the Proposed Development
Chapter 5 – EIA Scoping, Consultation and Key Issues
Chapter 6 – Air Quality and Climate
Chapter 7 – Noise and Vibration
Chapter 8 – Biodiversity Part A
Chapter 8 – AQUATIC ECOLOGICAL ASSESSMENT Part B
Chapter 9 – Land, Soil, Hydrogeology & Geology
Chapter 10 – Hydrology and Water Quality
Chapter 11 – Population, Human Health & Material Assets
Chapter 13 – Traffic and Transportation
Chapter 14 - Archaeology, Architectural and Cultural Heritage
Chapter 15 – Landscape and Visual
Volume III Appendices
1-1 - Curricula Vitae of EIAR Contributors
1-2 - Projects Considered in the Cumulative Assessment
1-3 - Consideration of Afforestation
3-1 - Construction and Environmental Management Plan
3-2 - Schedule of Environmental Commitments and Mitigations Measures
3-3 - Grid Connection Construction Methodology
3-4 - Biodiversity Enhancement and Management Plan
5-3 - An Bord Pleanála Correspondence and Pre-application Consultation Details
6-1 - Input Data for Carbon Calculator
7-1 - Baseline Measurements and Data Analysis
7-2 - Equipment Calibration Certificates
7-3 - Noise Sensitive Location Details
7-4 - Sound Power Level Data for Wind Turbines
7-5 - Predicted Noise Levels from Ballinagree Wind Farm at Nearby Noise Sensitive Locations
8A-1 - Terrestrial Biodiversity Survey Schedules & Statement of Competence.
8A-2 - Biodiversity Evaluation Scheme.
8A-3 - NPWS Recommended Methodology for Assessing the Impacts of Wind Farms on Breeding Hen Harrier.
8A-4 - Breeding Season VP Survey Results (2017 – 2020).
8A-5 - Winter Season VP Survey Results (October 2017 to March 2021).
8A-6 - General Bird Transect and Point Count Results
8A-7 - Non-Volant Mammals Survey Results.
8A-8 - Planning Phase Invasive Species Management Plan
8B-1 - Fisheries Assessment Report
8B-2 - Biological Water Quality (Q Sample Results)
8B-3 - Freshwater Pearl Mussel Survey Report
9-1 - Geotechnical & Peat Stability Assessment Report
9-2 - Factual Ground Investigation Report
10-1 - Photographs of Existing Hydrological Features
10-2 - Surface Water Management Plan
12-1 - Shadow Flicker Modelling Input Data
12-2 - Theoretical Shadow Flicker Times per Turbine (Scenario 01)
12-3 - Total Theoretical Shadow Times per Receptor (Scenario 01)
12-4 - Theoretical Shadow Flicker Times per Turbine (Scenario 02)
12-5 - Total Theoretical Shadow Times per Receptor (Scenario 02)
12-6 - Theoretical Shadow Flicker Times per Turbine (Scenario 03)
12-7 - Total Theoretical Shadow Times per Receptor (Scenario 03)
13-1 - Automatic Traffic Count Survey Results
13-2 - Turbine Delivery Route Survey Report
16-1 - Example Consultation Letter
16-2 - Ballinagree Wind Farm Impact on ILS Flight Inspection (Report)